This Fuerteventura forum makes use of cookies to store your login information if you are registered, and your last visit if you are not. Cookies are small text documents stored on your computer; the cookies set by this Fuerteventura forum can only be used on this website and pose no security risk. Cookies on this Fuerteventura forum also track the specific topics you have read and when you last read them. Please confirm whether you accept or reject these cookies being set.

A cookie will be stored in your browser regardless of choice to prevent you being asked this question again. You will be able to change your cookie settings at any time using the link in the footer.
Hi guest and welcome to the Fuerteventura forum.

Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5

[-]
Tags
puerto south fv3 fv2 repairs exit

Repairs to FV2 & FV3 at exit from Puerto to South
#1
Noticias:

The Cabildo makes improvements to the FV-2 and FV-3 roads at the exit from Puerto del Rosario to the south.

Due to the works, certain sections of the FV-2 road to the south and the branch that connects with the FV-3 will be closed


The Cabildo of Fuerteventura informs of the upcoming closure of a series of sections of the FV-2 and FV-3 roads, at the exit of Puerto del Rosario, due to the improvement and maintenance work carried out by its Ministry of Roads.

In this way, on December 10, 11 and 12, the FV-2 road will be closed to traffic in the direction of Morro Jable (right carriageway) in the section between the entrance of the ring road that joins it with the FV-3 to the area of the Barranco Río Cabras. On Sunday, December 11, the exit lane of the FV-3 road to the Airport will also be closed, so traffic will be diverted through the Hospital junction to make the U-turn in a southerly direction.



The Island Corporation apologises for the inconvenience caused by works that seek to improve the Island Road Network.

link to article for map
4 users say Thank You to TamaraEnLaPlaya for this post
Reply Quote
#2
Radio Sintonia:

The accesses to Fuerteventura Airport will close this Sunday and Monday at night.

The Cabildo of Fuerteventura informs of the upcoming closure of the link to the airport of the FV-2 road due to the rehabilitation works of the road surface that will be carried out by its Ministry of Roads, led by Blas Acosta.



In an effort to improve road conditions and ensure the safety of users, maintenance work will be carried out at night, from 23:00 p.m. to 5:00 a.m., scheduled to run from December 17 to 19, 2023.

Specifically, the work will be carried out on the night of Sunday, December 17, and the closure of the access and exit branch on the west side of the airport link is expected. This will involve the closure of the airport access lane and the airport exit lane in the direction of Puerto del Rosario – Morro Jable.

Likewise, on the night of Monday, December 18, the closure of the access and exit branch on the east side of the airport junction is contemplated. This will entail the closure of the airport access lane and the airport exit lane in the direction of Morro Jable – Puerto del Rosario.

The island corporation urges drivers to understand and collaborate, and also recommends planning alternative routes during the aforementioned time to avoid inconveniences in traffic.
2 users say Thank You to TamaraEnLaPlaya for this post
Reply Quote
#3
Noticias:

The Cabildo completes the repair of the road surface of the FV-2 at the exit of Puerto del Rosario.

Through the Ministry of Roads, the repainting of road markings on the same road is also carried out

The Cabildo of Fuerteventura, through the Ministry of Roads, directed by Blas Acosta, has carried out various works to improve the road infrastructure on the FV-2 at the exit of Puerto del Rosario. Between 10 and 14 December, important work was carried out on the section from the junction of the FV-3 ring road to the curve behind the Playa Blanca petrol station.



The intervention focused on the surface rehabilitation of the deteriorated road surface on the right road, with a meticulous prior regularization in multiple areas of the lanes that presented a higher degree of wear. In total, the rehabilitated area amounts to approximately 27,000 square meters, in an effort to improve the quality and safety of this important communication route.



In addition to these improvements, work is being carried out to repaint the road markings on the asphalted section of the same road. These works are underway and are expected to be completed over the next week, which will provide greater visibility and clarity in road signage for users.



At the same time, improvements have been made to the road surface at the airport link on the FV-2 road.



The Cabildo appreciates the understanding and collaboration of citizens during these improvements.
3 users say Thank You to TamaraEnLaPlaya for this post
Reply Quote


Possibly Related Threads...
Thread Author Replies Views Last Post
  Tender for new section of North-South axis, Cuchillete to Matas Blancas TamaraEnLaPlaya 1 1,804 05-09-2023, 08:10 PM
Last Post: TamaraEnLaPlaya
  FV1 - repairs between Guisguey & La Caldereta TamaraEnLaPlaya 0 1,420 05-10-2022, 09:00 PM
Last Post: TamaraEnLaPlaya
  Antigua, stone wall repairs at roadsides TamaraEnLaPlaya 0 3,489 22-11-2020, 12:07 AM
Last Post: TamaraEnLaPlaya
  Chappa Harry car repairs in Lajares poppi123 5 5,809 29-10-2020, 10:02 PM
Last Post: Decho
  Land Rover - Service/Sales/Repairs MLA 2 5,375 16-01-2020, 10:31 PM
Last Post: MLA

Forum Jump: