This Fuerteventura forum makes use of cookies to store your login information if you are registered, and your last visit if you are not. Cookies are small text documents stored on your computer; the cookies set by this Fuerteventura forum can only be used on this website and pose no security risk. Cookies on this Fuerteventura forum also track the specific topics you have read and when you last read them. Please confirm whether you accept or reject these cookies being set.

A cookie will be stored in your browser regardless of choice to prevent you being asked this question again. You will be able to change your cookie settings at any time using the link in the footer.
Hi guest and welcome to the Fuerteventura forum.

Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5

[-]
Tags
fuste road fv improvement caleta through

FV-2 Road improvement through Caleta de Fuste
#1
The Cabildo are putting out to tender for resurfacing and improvement of the FV-2 through Caleta de Fuste, with a budget of 1.9 million euros. It'll take 6 months when work starts.


The link: https://ondafuerteventura.es/a-licitacion-la-rehabilitacion-del-tramo-entre-la-glorieta-de-los-angeles-y-cruce-salinas/?fbclid=IwAR3S4rhucHjoKSex2XSvIDnb3A6QL5ARZbLKFQw5JNe0m9YqB7s_RuCtdg0

A Google translation: 
The Department of Infrastructure, Roads, Territorial Planning of the Cabildo de Fuerteventura, headed by President Sergio Lloret, has put out to tender, through a simplified open procedure with urgent processing, the rehabilitation of the FV-2 highway in the section that runs between the Glorieta de Los Ángeles and Cruce Salinas, within the municipality of Antigua.
As detailed by President Sergio Lloret during the visit made today, Tuesday, January 3, to the area that will be the object of the works, as it is located between Puerto del Rosario and El Castillo, "it is one of the areas with the highest traffic intensity in Fuerteventura ”. Reason for which he has assessed the works to be carried out as "absolutely necessary".
The works, which have a basic tender budget of almost 1.9 million euros and an execution period of six months, will include not only the superficial rehabilitation of the pavement in the section, but also the demolition and replacement of the existing curbs in the landscaped areas adjacent to the islets of the section.
The expansion of various sections of ditches and the construction of a rainwater collector, in order to improve traffic safety in the area, will also be the object of the action, which will include the replacement of the current vertical and horizontal signposting of the track and its markings.
The complete rehabilitation of the bike lane located next to the garden area, which is currently in significant deterioration, including the installation of a curb and a drainage channel for stormwater next to it, will also be the objective of the contract.
4 users say Thank You to Captain Sensible for this post
Reply Quote
#2
Quote:As detailed by President Sergio Lloret during the visit made today, Tuesday, January 3, to the area that will be the object of the works, as it is located between Puerto del Rosario and El Castillo, "it is one of the areas with the highest traffic intensity in Fuerteventura

I'm wondering if said visit made things worse, because I took the bus to the city today and the traffic was so bad it took 50 minutes! Longest time ever.  Big Grin

I don't know what they're planning on doing, but if it improves traffic, that'll be a blessing. Mostly it's fine, but when it's bad, it's very ugly.
3 users say Thank You to Ducks for this post
Reply Quote


Possibly Related Threads...
Thread Author Replies Views Last Post
  Walking/Cycling path between Caleta de Fuste and Las Salinas Ducks 9 10,464 12-01-2019, 08:28 AM