This Fuerteventura forum uses cookies
This Fuerteventura forum makes use of cookies to store your login information if you are registered, and your last visit if you are not. Cookies are small text documents stored on your computer; the cookies set by this Fuerteventura forum can only be used on this website and pose no security risk. Cookies on this Fuerteventura forum also track the specific topics you have read and when you last read them. Please confirm whether you accept or reject these cookies being set.

A cookie will be stored in your browser regardless of choice to prevent you being asked this question again. You will be able to change your cookie settings at any time using the link in the footer.
Hi guest and welcome to the Fuerteventura forum.

Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5

[-]
Tags
puerto lane installed rosario crane

New crane lane to be installed at Puerto del Rosario
#1
Noticias:

The port authority will change a crane lane at the dock of Puerto del Rosario.

It is essential due to the new load conditions required by the regulations, in addition to taking into account the aging of the infrastructure.
The Port Authority of Las Palmas (Spain) wants to replace one of the crane lanes of the container terminals of the Commercial Dock of Puerto de Rosario, located in Fuerteventura.

 

During one of their latest inspections, those responsible for the enclave have discovered that one of the sections of the rail for the gantry cranes has rusty anchors and lack of fastening, which is a risk for the operation of the cranes.

 

Therefore, the works will involve the collapse of the pavement, the removal of damaged material and the replacement of the lane. The project has an execution period of three months and a base bidding budget of 384,789.58 euros, as well as an estimated contract value of 359,616.43 euros.

 

The Commercial Dock of the Port of Rosario is used for the storage and transport of goods, especially in containers. This area has two container terminals offering berthing lines of 190 and 200 meters long, as well as two gantry cranes.

 
On the other hand, the Port Authority of Santa Cruz de Tenerife has begun this past December to reinforce and prepare the first alignment of the East dock located in the port. Those responsible for the enclave consider that these works are essential for the adaptation to the current conditions of loads required by the regulations, taking into account the old age of this infrastructure.
3 users say Thank You to TamaraEnLaPlaya for this post
Reply Quote


Possibly Related Threads...
Thread Author Replies Views Last Post
  Spanish naval vessel in Puerto del Rosario today TamaraEnLaPlaya 0 2,059 07-02-2023, 11:25 PM
Last Post: TamaraEnLaPlaya
  New Passenger Terminal for Puerto del Rosario dock TamaraEnLaPlaya 0 2,223 27-07-2022, 11:09 PM
Last Post: TamaraEnLaPlaya
  The Queen Elizabeth in Puerto del Rosario 27/12/21 Captain Sensible 1 2,660 29-12-2021, 09:15 AM
Last Post: GMT
  Cruise Ship Season - Puerto del Rosario 2020/21 Sam 31 17,471 01-07-2021, 01:16 PM
Last Post: Sam
  Cruise Ship Season - Puerto del Rosario 2019/20 Captain Sensible 46 23,933 02-05-2020, 09:42 AM
Last Post: Johnrgby

Forum Jump: